Windy september 22 2017 4 11pm 10.
Roof drip edge installation after shingles.
How to install a drip edge.
If it doesn t pull the drip edge out slightly from under the shingles.
It can be done.
Make sure the corner is tight and that the bottom edge is tight to the fascia before nailing off the drip edge.
Save yourself some.
It is designed to protect the roof s sheathing from water damage caused by rain snow or ice being blown or rolling back beneath the edge of the shingles.
Secure the drip edge with roofing cement.
Gently lift up the shingles on the edge of the roof and locate the nails holding the existing drip edge onto.
Once free slide the drip edge out and discard.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
Make sure to support the long end of the cut if you let it fall after cutting it will bend down and kink the drip edge.
Slowly lift a shingle that is closest to the apex of the roof.
Make sure the outer edge extends over the gutter.
Place the metal roof drip edge flashing along the gable ends.
You may need to nail through the starter strip into the drip edge.
Install the starter course.
This will allow for expansion and contraction and prevent buckling.
How to install drip edge flashing on a roof step 1.
Place a nail at one end then the other.
How to fix a roof drip edge installing roof drip edge flashing properly.
Install the drip edge by fitting it on the roof eave pushing it tightly against the edge of the plywood and.
Measure the length of the eave you need to cover with drip edge using a tape measure.
Using a utility knife cut back the front end of the drip edge.
Install roof drip edge along the eaves add underlayment then place drip.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Once all the underlayment is applied go back and place.
Gently slide the flatter side of the drip edge under the eave.
Use a flat pry bar and hammer to pry the nails out of the drip edge gently.
Push the drip edge a bit so that it passes under the shingle and appears from its other side.
The starter course is comprised.
Select enough lengths of.
Using drip edge with a nailing edge approx.
Now that the roof is applied it is much more difficult invasive time consuming to install the drip edge being 3 stories only makes it much worse.
Drip edging is a strip of flashing that is applied to the edge of roofing prior to the installation of other items.
4 deep nail the drip edge to the sheathing every 16 if installing multiple runs of drip edge lap them by 1 4 1 2 inch keeping the nail back from the lapped joint.