Tip 2 is.
Roof drip edge installation on existing roof.
Coat the flat part of the flashing that sits on the deck using a putty knife.
Three tips for overlapping drip edge flashing.
Save yourself some.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
Ask this old house general contractor tom silva demonstrates the importance of a properly installed drip edge subscribe to this old house.
Overlap pieces at least a couple of inches shingle style with pieces higher up on the roof overlapping pieces lower.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Once all the underlayment is applied go back and place.
Secure the drip edge with roofing cement.
Apply a continuous bead of cement along the top of the drip edge then press down on the shingle.
Install roof drip edge along the eaves add underlayment then place drip.
How to fix a roof drip edge installing roof drip edge flashing properly.
If it doesn t pull the drip edge out slightly from under the shingles.
Make sure the outer edge extends over the gutter.
Place the metal roof drip edge flashing along the gable ends.
Lift the shingles slide the drip edge underneath them and position it so that it extends over the gutters then replace the shingles and push down to seat the drip edge.
The roof leg should extend a minimum of 2 back onto the roof sheathing.